NTPC Limited (a maharatna Public Sector Undertaking) invites application for 250 Experienced Engineers and 25 Experienced Assistant Chemist of various discipline having brilliant academic record for operation of its thermal power stations for its Projects.
NTPC LIMITED
|
|||
250 Experienced
Engineers and 25 Experienced Assistant Chemist Recruitment 2020
|
|||
For more Job Updates visit Our Site :
|
IMPORTANT
DATES
• Online Registration Start :
15 July 2020
• Registration Last Date : 31 July 2020
APPLICATION
FEE
• General, EWS, OBC Candidates : Rs.300/-
• SC/ST/PwBD/XSM/Female : Nil
MODES
OF PAYMENT
The payment can be made either online or offline mode.
|
||
250 Experienced Engineers and 25
Experienced Assistant Chemist Particulars
UPPER AGE LIMIT : 30 YEARS (Relaxation there for Categories)
|
|||
DESIGNATION
|
VACANCY
|
ELIGIBILITY DETAILS
|
PAY SCALE
|
Electrical Engineer
(E2 Grade)
|
UR- 44
OBC - 17
SC- 10
ST-4
Total - 75
|
• Engineering Degree in Electrical with
minimum 60% marks.(Pass mark for SC/ST/PwBD)
• Experience : 3 year post qualification
executive experience in O&M/ Erection/ Construction in main plant
Thermal/Gas. (excluding training period). Out of 3 year 2 year in power plant
sites.
|
50000-160000
|
Mechanical Engineer
(E2 Grade)
|
UR-
63
OBC
- 28
SC-
17
ST-
7
Total
- 115
|
•
Engineering Degree in mechanical with minimum 60% marks.(Pass mark for
SC/ST/PwBD)
•
Experience : 3 year post qualification executive experience in
O&M/ Erection/ Construction in main plant Thermal/Gas. (excluding
training period). Out of 3 year 2 year in power plant sites.
|
50000-160000
|
Electronics Engineer
(E2 Grade)
|
UR- 15
OBC – 10
SC- 3
ST- 2
Total - 30
|
• Engineering Degree in Electronicsl with
minimum 60% marks.(Pass mark for SC/ST/PwBD)
• Experience : 3 year post qualification
executive experience in O&M/ Erection/ Construction in main plant
Thermal/Gas. (excluding training period). Out of 3 year 2 year in power plant
sites.
|
50000-160000
|
Instrumentation Engineer
(E2 Grade)
|
UR-
15
OBC
– 10
SC-
3
ST-
2
Total
- 30
|
•
Engineering Degree in Instrumentation with minimum 60% marks.(Pass
mark for SC/ST/PwBD)
•
Experience : 3 year post qualification executive experience in
O&M/ Erection/ Construction in main plant Thermal/Gas. (excluding
training period). Out of 3 year 2 year in power plant sites.
|
50000-160000
|
Asst. Chemist
(E1 Grade)
|
UR- 11
OBC - 7
SC- 4
ST- 3
Total - 25
|
• MSc in Chemistry with minimum 60%
marks.(Pass mark for SC/ST/PwBD)
• Experience : 3 year post qualification
executive/superviser experience in WTP/RO/DM Plant. Boiler Water Chemistry,
Coal Sampling Analysis, Oil Analysis, Environment parameter testing, Bulk
chemical analysis, Analytic Instrument. (excluding training period). Out of 3
year 2 year in power plant sites.
|
40000-140000
|
HOW TO
APPLY
|
|||
|
·
All
Interested Candidates can Apply Online from 15/07/2020
to 31/07/2020.
·
Please
Read the Advertisement for More Details about this Recruitment.
·
Kindly
Fill Your Basic Details and Upload Your Photo, Signature, Proof of Payment
slip less than 500 KB in JPG/JPEG format.
·
Check
Your full Details Preview Before Submit Application Form.
·
Pay
Online Required Application Fee (if asked) or Print Pay-in-Slip and deposit
the amount in respective nationalised bank to Complete the Form.
·
Take a
Print Out of Submit Final Form and e- receipt for Further Process.
|
|||
IMPORTANT LINKS
|
|||
ADVERTISEMENT
|
|||
OPEN RECRUITMENT DASHBOARD
|
|||
APPLY ONLINE
|
|||
PRINT PAY-IN-SLIP (OFFLINE
PAYMENT)
|
|||
For more job
updates follow https://jobhorizon.blogspot.com
|
|||
About:
NTPC is India’s largest energy conglomerate with roots planted way back in 1975 to accelerate power development in India. Since then it has established itself as the dominant power major with presence in the entire value chain of the power generation business. From fossil fuels it has forayed into generating electricity via hydro, nuclear and renewable energy sources. This foray will play a major role in lowering its carbon footprint by reducing green house gas emissions. To strengthen its core business, the corporation has diversified into the fields of consultancy, power trading, training of power professionals, rural electrification, ash utilisation and coal mining as well.
NTPC became a Maharatna company in May 2010. As of January 2020, there are 10 Maharatnas CPSEs in India. NTPC is ranked No. 2 Independent Power Producer(IPP) in Platts Top 250 Global Energy Company rankings.


No comments:
Post a Comment